Last Updated:2025/11/29
After the canal burst, the crew installed a stop plank across the breach to hold back the water until permanent repairs could be made.
See correct answer
After the canal burst, the crew installed a stop plank across the breach to hold back the water until permanent repairs could be made.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)