Last Updated:2025/11/29
The crew shut down production after a leak was discovered in the flowline that connects the seabed well to the drilling rig.
See correct answer
The crew shut down production after a leak was discovered in the flowline that connects the seabed well to the drilling rig.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)