Before restarting the pump, the engineer inspected the stuffing box for leaks and tightened the packing as needed.

See correct answer

Before restarting the pump, the engineer inspected the stuffing box for leaks and tightened the packing as needed.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

ポンプを再起動する前に、技師は漏れがないか軸封装置を点検し、必要に応じてパッキングを締め直しました。