Last Updated:2025/11/28
The engineering team adopted design by contract to ensure each module's preconditions and postconditions were rigorously checked.
See correct answer
The engineering team adopted design by contract to ensure each module's preconditions and postconditions were rigorously checked.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence
エンジニアリングチームは、各モジュールの前条件と後条件が厳密に検証されるよう、契約に基づく設計を採用した。