Last Updated:2025/11/28

The engineering team adopted design by contract to ensure each module's preconditions and postconditions were rigorously checked.

See correct answer

The engineering team adopted design by contract to ensure each module's preconditions and postconditions were rigorously checked.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

エンジニアリングチームは、各モジュールの前条件と後条件が厳密に検証されるよう、契約に基づく設計を採用した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★