Last Updated:2025/11/27
Before building the new bridge, the construction team planned to piledrive the support pilings into the riverbed.
See correct answer
Before building the new bridge, the construction team planned to piledrive the support pilings into the riverbed.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)