Last Updated:2025/11/27
To enhance the seismic fitness of the new hospital, the design team prioritized vibration control throughout the structural plan.
See correct answer
To enhance the seismic fitness of the new hospital, the design team prioritized vibration control throughout the structural plan.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)