Last Updated:2025/11/27
After the tremor, the engineers assessed the building's seismic performance to determine necessary repairs.
See correct answer
After the tremor, the engineers assessed the building's seismic performance to determine necessary repairs.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)