Last Updated:2025/11/27

After the inspection, the contractor scheduled several groutings to strengthen the cracked foundation walls.

See correct answer

After the inspection, the contractor scheduled several groutings to strengthen the cracked foundation walls.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

点検の後、施工業者はひび割れた基礎壁を強化するために複数回のグラウト注入作業を予定した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★