Last Updated:2025/11/26
The engineering team pontooned the damaged bridge to allow vehicles to cross until a permanent repair could be made.
See correct answer
The engineering team pontooned the damaged bridge to allow vehicles to cross until a permanent repair could be made.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)