Last Updated:2025/11/26
The plant scheduled a LOFT to verify emergency cooling response after the simulated pipe rupture.
See correct answer
The plant scheduled a LOFT to verify emergency cooling response after the simulated pipe rupture.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)