Last Updated:2025/11/25
The constructibility of the new bridge was confirmed after engineers conducted thorough soil tests.
See correct answer
The constructibility of the new bridge was confirmed after engineers conducted thorough soil tests.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)