Last Updated:2025/11/24
Before we applied the finish, the inspector verified that the roof assembly met all specifications for the deck, vapor retarder, insulation, and covering.
See correct answer
Before we applied the finish, the inspector verified that the roof assembly met all specifications for the deck, vapor retarder, insulation, and covering.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)