Last Updated:2025/11/24
Before pouring the structural foundation, the crew poured a mud slab over the saturated subgrade to provide a stable working surface.
See correct answer
Before pouring the structural foundation, the crew poured a mud slab over the saturated subgrade to provide a stable working surface.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)