Last Updated:2025/11/24
The engineers specified a mat slab to resist the uplift forces caused by hydrostatic pressure beneath the structure.
See correct answer
The engineers specified a mat slab to resist the uplift forces caused by hydrostatic pressure beneath the structure.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)