Last Updated:2025/11/24

The contractor specified a minimum drying time of 48 hours to ensure the coating would resist dew, rain, and freezing temperatures.

See correct answer

The contractor specified a minimum drying time of 48 hours to ensure the coating would resist dew, rain, and freezing temperatures.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

請負業者は、塗膜が露や雨、凍結の影響を受けないよう、揮発性成分が失われるまでの最低期間を48時間と指定した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★