Last Updated:2025/11/24
The design load for the new bridge was calculated to ensure safety under extreme wind and traffic conditions.
See correct answer
The design load for the new bridge was calculated to ensure safety under extreme wind and traffic conditions.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)