Last Updated:2025/11/24
The architect specified a double lock standing seam for the rooftop to ensure maximum water resistance and wind uplift performance.
See correct answer
The architect specified a double lock standing seam for the rooftop to ensure maximum water resistance and wind uplift performance.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)