Last Updated:2025/11/24

The engineer ordered a controlled sub-excavation under the old foundation to reach the required subgrade level.

See correct answer

The engineer ordered a controlled sub-excavation under the old foundation to reach the required subgrade level.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

技術者は所定の路盤高に達するため、老朽化した基礎の下で慎重に下部掘削を行うよう指示した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★