Last Updated:2025/11/24
The engineer ordered a controlled sub-excavation under the old foundation to reach the required subgrade level.
See correct answer
The engineer ordered a controlled sub-excavation under the old foundation to reach the required subgrade level.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)