Last Updated:2025/11/24
The research team geodetically corrected the baseline measurements before analyzing tectonic shifts.
See correct answer
The research team geodetically corrected the baseline measurements before analyzing tectonic shifts.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)