Last Updated:2025/11/23
The engineers specified shotcrete to stabilize the tunnel walls before excavation continued.
See correct answer
The engineers specified shotcrete to stabilize the tunnel walls before excavation continued.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)