Last Updated:2025/11/22

The engineer measured the depths of the footings before ordering more concrete.

See correct answer

The engineer measured the depths of the footings before ordering more concrete.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

技師は追加のコンクリートを注文する前に、基礎の深さを測った。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★