Last Updated:2025/11/22
The construction crew installed sheet piling along the excavation to prevent soil collapse during the downtown redevelopment.
See correct answer
The construction crew installed sheet piling along the excavation to prevent soil collapse during the downtown redevelopment.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)