Last Updated:2025/11/22

After reaching the target depth, the drilling team inspected the wellbore for signs of instability before running casing.

See correct answer

After reaching the target depth, the drilling team inspected the wellbore for signs of instability before running casing.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

目標深度に到達した後、掘削チームはケーシングを入れる前に、油井やガス井を掘削して生じた穴に不安定の兆候がないか点検した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★