Last Updated:2025/11/22
After reaching the target depth, the drilling team inspected the wellbore for signs of instability before running casing.
See correct answer
After reaching the target depth, the drilling team inspected the wellbore for signs of instability before running casing.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)