Last Updated:2025/11/22
The dockworker signaled the crane operator to lift the heavy crate onto the ship's hold.
See correct answer
The dockworker signaled the crane operator to lift the heavy crate onto the ship's hold.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)