Last Updated:2025/11/21
The construction team inspected the diaphragm walls before pouring the concrete base.
See correct answer
The construction team inspected the diaphragm walls before pouring the concrete base.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)