Last Updated:2025/11/21

The engineer inspected the concrete slab for voids that could weaken the foundation.

See correct answer

The engineer inspected the concrete slab for voids that could weaken the foundation.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

エンジニアは基礎を弱める可能性のあるコンクリートスラブの空洞を点検した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★