Last Updated:2025/11/21
The engineers rerouted the power to avoid overloading the substation during the storm.
See correct answer
The engineers rerouted the power to avoid overloading the substation during the storm.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)