Last Updated:2025/11/21

The surveyor used the datum line as the base for all elevation measurements on the site.

See correct answer

The surveyor used the datum line as the base for all elevation measurements on the site.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

測量士は現場の全ての標高測定の基準として基準線を使用した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★