Last Updated:2025/11/21

The engineer inspected the segmental tunnel lining for signs of displacement after the earthquake.

See correct answer

The engineer inspected the segmental tunnel lining for signs of displacement after the earthquake.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

技師は地震後にずれの兆候がないか、区画ごとに組み立てられたトンネル覆工を点検した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★