Last Updated:2025/11/21
The engineering team excavated an adit to improve drainage and provide a safer haulage route into the old copper mine.
See correct answer
The engineering team excavated an adit to improve drainage and provide a safer haulage route into the old copper mine.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)