Last Updated:2025/11/21

The engineering team excavated an adit to improve drainage and provide a safer haulage route into the old copper mine.

See correct answer

The engineering team excavated an adit to improve drainage and provide a safer haulage route into the old copper mine.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

技術チームは排水を改善し、より安全な運搬経路を確保するために、地表から古い銅山へと続く水平坑道を掘った。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★