Last Updated:2025/11/20
The engineers inspected the hydroelectric generator before the seasonal rains increased river flow.
See correct answer
The engineers inspected the hydroelectric generator before the seasonal rains increased river flow.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)