Last Updated:2025/11/20

The engineer measured the air flow through the vent to ensure proper cooling.

See correct answer

The engineer measured the air flow through the vent to ensure proper cooling.

音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)
Source Sentence

エンジニアは適切な冷却を確保するために、通気口を通る気流を測定した。

Sentence quizzes to help you learn to read

Edit Histories(0)

Login / Sign up

 

Download the app!
DiQt

DiQt

Free

★★★★★★★★★★