Last Updated:2025/11/20
The engineers performed hydrostatic tests on the pipeline to ensure it could withstand high pressures.
See correct answer
The engineers performed hydrostatic tests on the pipeline to ensure it could withstand high pressures.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)