Last Updated:2025/11/20
The contractor specified a CU volume of 12 cubic feet for each concrete form to meet the project's structural requirements.
See correct answer
The contractor specified a CU volume of 12 cubic feet for each concrete form to meet the project's structural requirements.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)