Last Updated:2025/11/20
The engineers adjusted the weir each morning to maintain steady water levels for the downstream irrigation canals.
See correct answer
The engineers adjusted the weir each morning to maintain steady water levels for the downstream irrigation canals.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)