Last Updated:2025/11/20
Before casting, the technician cleaned the sprue so that the hole through which molten metal is poured into the gate and thence into the mold would not be blocked.
See correct answer
Before casting, the technician cleaned the sprue so that the hole through which molten metal is poured into the gate and thence into the mold would not be blocked.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)