Last Updated:2025/11/20
The engineers decided to revet the exposed riverbank with interlocking concrete blocks before the spring thaw.
See correct answer
The engineers decided to revet the exposed riverbank with interlocking concrete blocks before the spring thaw.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)