Last Updated:2025/11/19
The engineers anchored a pontoon alongside the river to support the temporary footbridge while repairs were made.
See correct answer
The engineers anchored a pontoon alongside the river to support the temporary footbridge while repairs were made.
音声機能が動作しない場合はこちらをご確認ください
Edit Histories(0)